projects
Company Works
Kemat Al-Jedar Engineering Company has more than 40 engineering projects in various fields.
- Installation of a 24-inch pipeline, 600 meters in length, using the Horizontal Directional Drilling (H.D.D) method for the Oil Pipelines Company in Karbala Province, extending to the Al-Khayrat Station.
- Installation of a 16-inch pipeline, 460 meters in length, under the Euphrates River in Al-Hindiya, Karbala, for the Oil Pipelines Company.
- Installation of 12-inch and 14-inch pipelines in Al-Hindiya, near Twereej, with a total length of 270 meters in Karbala, for the Oil Pipelines Company using the H.D.D method.
- Installation of an 800-meter, 24-inch pipeline over the Tharthar Canal and Al-Ishaqi River for the Oil Pipelines Company.
- Installation of 800-meter pipelines (18-inch and 14-inch) over the Tharthar Canal and Al-Ishaqi River in Samarra District, Salah al-Din Province.
- Maintenance of three oil pipelines, extending 28 kilometers, over the Al-Fatha Bridge in Salah al-Din / Baiji – Kirkuk.
- Maintenance works on thermal furnaces 0403 in Salah al-Din / Baiji Refinery.
- Completion of pipeline installation in North Rumaila to Well No. 20 in Basra, including pipeline maintenance, for the Oil Pipelines Company.
- Installation of a 16-inch pipeline from the Majnoon Oilfield to Al-Hartha Power Station, 18 kilometers in length, for the Oil Pipelines Company / Basra.
- Installation of a 24-inch pipeline, 320 meters in length, under the Al-Budai’a Canal and railway tracks in Basra, for the Italian company INE.
- Installation of a 24-inch pipeline, 370 meters in length, under the Al-Budai’a Canal and railway tracks (Phase Two) in Sector 9 of South Rumaila, Basra, for INE and Basra Oil Company.
- Installation of a pipeline in the Utba area, Shatt al-Arab District, with a total length of 13 kilometers, including 1.7 kilometers using the H.D.D method.
- Installation of a 14-inch pipeline, 1,200 meters in length, across the Tigris River in Baghdad (from Dora to Zafaraniya) for the Oil Pipelines Company.
- Various maintenance operations at the Ankor depot in Anbar Province.
- Installation of four storage tanks (each with a capacity of 3,000 liters) for Al-Hartha Power Station, Ministry of Electricity.
- Maintenance of four steam boilers at Al-Hartha Power Station in Basra.
- Main sewer line project in the Toba and Nakheel area, Basra Province.
- Rehabilitation of Al-Hamdani Street in Karbala Province, extending for 6 kilometers.
- Construction of a residential complex (Al-Qimmah Residential Complex) in Dhi Qar Province, Nasiriyah.
- Construction of a residential complex (Al-Tawoos Residential Complex) in Najaf Province.
- The Babylon Canal Pumping Station Project in Babylon Governorate.
Our clients
We work with excellence to achieve our clients goals

شركة الإيطالية INE

شركة نفط البصرة

شركة BP الإيطالية

شركة الخطوط الانابيب النفطية

شركة كويت انرجي

شركة الخطوط النفطية

شركة مصافي الشمال

شركة مصافي الشمال

وزارة الموارد المائية (شركة الفاو شركة العراق شركة الرافدين)

وزارة الكهرباء محطة الهارثة توزيع وسط وجنوب

شركة سكوب النفطية

شركة CPP الصينية
Our completed works
next
prev
